Margarita Salas High School in Seseña

Seseña, Toledo

Project date: February 2007
Work: January 2009
Builded surface: 9.181 m2

First prize
“Margarita Salas” High School has 24 classrooms of secondary education and 6 for baccalaureate. It is located on the urban edge of Seseña, Toledo, in a natural environment with strong slope. The building is arranged with 6 linear blocks in a spectrum, on the one hand inserted into the ground and on the other, elevated. These blocks are linked by a double-height lobby.

The building was constructed with an optimized system that allows rapid implementation, 5 months, and by phases. The structure lightens as the terrain rises, with a considerable amount of savings in necessary material. Conventional elements are used, but the system allows the building to have a distinct personality.

Program

Net areas:
• Lower secondary (24+13): 2,305 m2
• Higher secondary (6+7): 926 m2
• Common services: 873 m2
• Sports hall: 1,345 m2
• Administration: 294 m2
• General services: 393 m2

Outer area (2 courts): 11,276 m2

Credits

Client:
Consejería de Educación y Ciencia de Castilla-La Mancha

Architecture:
Ramón Lahoz Rodríguez and Natalia López Matesanz

Collaborators:
Jokine Crespo Arbisu, Luis Marcos Díaz, Marta Rodríguez Fernández, Mª Amor Arroyo Sánchez and Carolina Gonzalez García

Installation Engineer:
CIP Consulting

Construction Company:
Construcciones Lahoz Soto, SA