Los Manantiales Health Center

Guadalajara

Project date: June 2004
Work: April 2007
Builded surface: 4.238 m2

They proposed to us the expansion of a small clinic, in Villanueva de la Fuente, to convert it in a primary care centre, equipped with: general consultations, dentistry, paediatrics, rehabilitation and urgent care.

We planned to build a second volume parallel to the existing one, with similar proportions and on the ground floor, an enveloping element as a connection between them. By doing this way, we included the initial piece in the proposal, which became part of the building, not an addition.

Program

Outpatients clinic: 1,702 m2
Emergency: 584 m2
General services: 534 m2
Physical Therapy: 326 m2
Car Park: 1,092 m2

Credits

Client:
SESCAM, Servicio de Salud de Castilla La-Mancha

Architecture:
Ramón Lahoz Rodríguez and Natalia López Matesanz

Collaborators:
Ana Valenzuela Aguayo, Alexandra Von Uckermann, Carmen Panadero Reyes, Fabio Surrentino, Jose A. Carrasco Rodríguez and Alicia Arnuero Martínez

Construction Site Management:
Ramón Lahoz Rodríguez

Construction Management:
José Collado Barrio and Antonio Franco Mamajón

Construction Company:
Dragados, SA

Installation Engineer:
CIP consulting